top of page

Our Projects

Groundbreaking-3-cropped-rendering-Ctr-For-Active-Aging_edited.jpg

Center For Active Aging

  • Common Areas Air Conditioning / Control, Monitoring and Integration

  • VAV Boxes / Control, Monitoring and Integration

  • Power Building Manager / Monitoring and Integration

9dfcacfa-e2ff-4e71-83af-b18a0f5432b2_edi

Sunnybrook Storage

  • UUKL 864 Smoke Control System / Control, Monitoring and Integration

  • Garage Exhaust Gases System / Monitoring and Integration

  • Stairwell Pressurization

  • Multi Area Exhaust Fans System / Control and Monitoring

WMg5Fri4W530821HGJdyjPX6MtVuKb-lBKgvnRT368I.jpg
crop-Render+Southeast+11-20.png

Royal Gallery Shopping Center

  • Condenser Water System / Control, Monitoring and Integration

  • Common Areas Air Conditioning / Control, Monitoring and Integration

Block 55

  • VRF AC System / Low Voltage Wiring, Control, Monitoring and Integration

  • Stairwell Pressurization

  • Outside Air System / Control, Monitoring and Integration

06_edited.jpg

Even Hotel

  • Outside Air System / Control, Monitoring and Integration

  • Multi Area Exhaust Fans System / Control, Monitoring and Integration

  • VRF AC System / Low Voltage Wiring, Control, Monitoring and Integration

IMG_6085.jpg

Nature Vitamins Lab

  • Production Areas Air Conditioning / Control, Monitoring and Integration of Air Flow, Pressure, Temperature and Humidity

efgved.jpg
Tablet_00000.jpg

Pacific Center Mall

  • Chilled Water Distribution System / Control Monitoring and Integration

  • Outside Air System and Air Conditioning Common Areas and Hotel Gues Room- Control, Monitoring and Integration

  • Outside Air System and Air Conditioning Common Areas for Clinic Consulting Tower / Control, Monitoring and Integration

  • Outside Air System and Air Conditioning Common Areas for Theatre Building / Control, Monitoring and Integration

  • Air Conditioning Common Areas Shopping Center / Control, Monitoring and Integration

Aria Reserve

  • Stairwell and Elevator Pressurization

  • VRF AC System / Low Voltage Wiring, Control and Monitoring

  • Condenser Water System / Control, Monitoring and Integration

  • Boilers and Hot Water System- Control, Monitoring and Integration

  • Outside Air System / Control, Monitoring and Integration

  • Garage Exhaust Gases System- Monitoring and Integration

onda-residences-bay-harbor-1381x1534.jpeg

Onda

  • Condenser Water System / Control, Monitoring and Integration

  • Stairwell and Elevator Pressurization

  • Common Areas Air Conditioning / Control, Monitoring and Integration

  • Boilers and Hot Water System / Control, Monitoring and Integration

  • Outside Air System / Control, Monitoring and Integration

iStock-184694561.jpg
2021-10-24+(2).png

Weston Clean Room

  • Air Conditioning / Monitoring and Integration  of Temperature and Humidity

The Garden

  • Stairwell Pressurization

  • Outside Air System / Control, Monitoring and Integration

  • Common Areas Air Conditioning- Control, Monitoring and Integration

IMG_6067.jpg

590 Flagler

  • Garage Exhaust Gases System- Monitoring and Integration

  • Stairwell Pressurization

  • Outside Air System / Control, Monitoring and Integration

  • Multi Area Exhaust Fans System / Control and Monitoring

  • Generator System / Monitoring and Integration

bottom of page